RETGAS
All rules
Result consistency Validation rules engine

A compliant report can’t have failed items

Marking “Compliant” with a defect in the checklist is a contradiction the distributor rejects. The rule catches it and says which items to review.

A rule in use at inspection bodies; names changed

The inspector marks an item as “Fails” and, at the end, leaves the result as “Compliant.” It may be a wrong tap or a criterion applied badly.

Whatever the cause, the report says two opposite things. The distributor returns it.

The rule

Checks
The installation result and each checklist item.
Blocks when
The result is Compliant and some item is marked Fails, NC, Critical or Non-critical.
Message to the inspector
“When the status is Compliant you can’t mark the following items as Fails or NC: Shut-off valve, Upper ventilation.”
Applies to
Forms with a result and a checklist.

Test cases

This is how it’s simulated before saving: if a case doesn’t give the expected result, nothing is saved.

Situation Result
Compliant · all items pass Passes
Compliant · one item fails Blocks
Non-compliant · one item fails Passes

Variant: the other way around too

A Non-compliant report must have at least one failed item. If it has none, the result doesn’t add up either.

Ask your assistant for it

With the RETGAS connector in Claude, all you have to write is:

«Make a rule so that a Compliant report can’t have items marked Fails or NC, and have the message say which ones.»

Why it matters

  1. It says which items to review

    The message lists the conflicting items. The inspector goes straight to them.

  2. The person decides

    The rule doesn’t change the result. It flags the contradiction and the inspector decides whether to fix the item or the result.

The engine flags and the person decides. Rules only run when they’re active and linked to the form. How they’re configured

Result consistency is the first thing whoever receives the report looks at. Better to have the engine check it first.

Other examples

Personalized demo · response < 2 business h

Ready to optimize your operation?

In 20 min: how to cut admin time by 60%. No commitment.

  • ✓ Walkthrough with your real case
  • ✓ Quote based on your volume
  • ✓ Deployment in 1–2 weeks
Follow us: Facebook Instagram WhatsApp

Book your demo

5 fields. We'll reach out on WhatsApp the same day.

By submitting you accept our privacy policy.

Message us on WhatsApp